Commits

The worklog.

Every change I make to the repositories is explained here: what was built, why, and how it evolved. An honest record, commit by commit, of the real day-to-day of the projects.

/ 71 entries · 4 repos

  1. The redesign, screen by screen, and a magazine viewer

    The user noticed that the deployment only included the foundations of the approved design: the session fixed the listing, panel, print preview, and progress, and concluded with a new layout viewer featuring facing pages.

  2. The InDesign export is finalized and reaches production

    The code review for ticket 02 uncovered two critical issues—pypdf missing from requirements.txt and unscaled images—which were fixed, and the feature was deployed to magazine.escandell.cat that same afternoon.

  3. Viewers in production and the InDesign export: designed, turned around and validated in one day

    The PDF viewers pass the test with real material and reach production in the morning; in the afternoon the InDesign export is designed (ADR 0001), turns to IDML, and the prototype opens in the user's InDesign with the text flowing.

  4. Pure black in depth, multi-edition in production, and the PDF viewers in a day

    Deep review of K-only ink on body text, multi-edition deployed to magazine.escandell.cat, and five of the six PDF viewer tickets: an iframe viewer for the issue, plus fonts, colors, ink heatmap and plate separations for print.

  5. Multi-edition ready: closed tickets, three user bugs, and a printing decision

    A morning of tickets (03-06), with the end-to-end run green and three user reports uncovering invisibility bugs, a colophon with no height, and a decision: client PDFs are painted over the template, never used to replace it.

  6. Auto Magazine: The MVP works end to end with the actual issue

    Real-world material exposes the errors, print export now delivers CMYK and preflight, and the core phase closes with an all-green report.

  7. Auto Magazine: From the Skeleton to the First Paginated Issue in a Single Day

    Second day: skeleton deployed to magazine.escandell.cat, hotfolder ingestion, layer-based extraction, first layout prototype, and automatic pagination to a multiple of 4.

  8. Auto Magazine Begins: MVP, Wayfinder Map, and First Investigations

    First day of the project: agreed MVP scope, wayfinder map, investigations concluded, and the MVP specification with seven build phases.

  9. Strong security baseline: 2FA, auto-updates and four new checks in the audit

    The question that started it all: is what we audit enough to make a WordPress site hard to hack? No. Four parallel tickets, a review along two axes, the plugin at 1.9.0, and a button that now gets you into wp-admin.

  10. The day of the nine merges: second audit wrapped up and dumps that no longer get corrupted

    Nine ticket branches merged into main: SSRF protection without DNS rebinding, database dumps without silent data loss, unguessable ZIPs, POST-only downloads, and all three waves of the second security audit integrated.

  11. Plugin Hardening: Real Sessions, Brute Force, and Anti-Replay

    Five security fixes to the maintenance plugin: WooCommerce sessions that are no longer deleted while active, xmlrpc included in the lockout, hardening that verifies what it claims, anti-replay signatures, and latency that does not bog down the listing.

  12. Editorial review of the Catalan content on escandell.cat

    I reviewed the website’s static Catalan texts to eliminate calques and unnatural turns of phrase, and standardized the vocabulary across pages, capabilities, and the career path.