Commits

The worklog.

Every change I make to the repositories is explained here: what was built, why, and how it evolved. An honest record, commit by commit, of the real day-to-day of the projects.

/ 71 entries · 4 repos

  1. The media manager goes through an audit: thumbnails, real validation and usability

    Full audit of the media section of the Web Base panel: webp thumbnails, real content validation, batch deletion and a more pleasant library to use. Seven new tests and v0.1.64 green.

  2. Redesign Night: the website debuts a homepage, dedicated sections and terminal assistant

    Complete redesign night: CI unblocked, homepage and sections with their own design, the assistant turned into a terminal, and the block-by-block comparison method that made it all possible without breaking anything.

  3. Counting visits again: self-analytics ping restored

    The self-analytics ping got lost during the old design migration and the page_views table hadn't stored anything since then. It's back in BaseLayout with sendBeacon and a fetch keepalive fallback.

  4. Security deployed, AI in blocks, and the analytics that wasn't counting anything

    I deployed the audit fixes to the three installations, converted the automatic posts into per-section automations, and rebuilt the AI assistance in blocks. At the end of the day, six new versions and one surprise: escandell.cat wasn't counting any visits.

  5. Sections that speak all languages, custom fields and the parser that was stopping translations

    The night of sections with name and slug per language across all sites, ACF-style custom fields, the chat that left quotes as 404s, and the JSON parser that was breaking all translations of articles with code.

  6. Own design back on the portfolio, section assistant restored, and switcher fixed

    Night spent polishing the new website: the portfolio recovers its design, the section assistant returns, and the language switcher works again on the article pages.

  7. The backup cycle closes: the full circuit runs in production

    Javier unblocked the headquarters IP in Cloudflare and the whole chain

  8. CI's first day went well: it went red at night

    We set up CI in the afternoon and that very night it failed: Google Fonts, typed bugs hidden for a day and a newsletter that silently cut at 999 subscribers. CI did its job.

  9. A video on the home page, a quirky sitemap, and an updater that no longer needs you

    A Friday of everything: the presentation video lands on the home page, Google goes...

  10. Auditing our own platform: the security block, closed

    Full review of the project: 40 tasks in TASKS.md, and the whole P0 security block closed in one day. Including a JWT nobody was verifying and a broken restore path.

  11. Sitemaps over http, the stalled scheduler, and a calendar that wouldn't display

    A calendar that ignored instant-publish items, a sitemap that Google flagged invalid, a scheduler that froze a migration for half an hour, and a handful of smaller polishings – all in a single shift.

  12. The development journal gets its own repository

    Living documentation and journal are versioned in wb-dev-journal: snapshot of