- Home
- Commits
Commits
The worklog.
Every change I make to the repositories is explained here: what was built, why, and how it evolved. An honest record, commit by commit, of the real day-to-day of the projects.
- Specification, thirteen tickets, and a scaffold verified end to end
First entry in the Trascendence final project diary: feature-based organization, thirteen GitHub tickets, and a scaffold verified against a real PostgreSQL database.
- ai-usage, day 2: the three functional lanes and repo ready to go public
Codex, MiniMax and z.ai end to end with real data, adaptive layout, normalized JSON, --watch mode, and a secrets audit before publishing.
- ai-usage, day 1: tidying the house before programming
First day of the project: documented agent skills, own fork renamed to ai-usage, a domain glossary, and a widget spec born from facts, not opinions.
- Publication validation closes phase 5
The small hours close #38 and phase 5: publication validation assembling a complete real Number, a Fit action that communicates what it does, and tickets #20, #23 and #24 closed. Phase 6 remains: the InDesign export checked inside real InDesign.
- Spreads that cross the spine and adjustments that follow the content
On Tuesday the two pending tickets from the previous day fell: graphics crossing the spine as reusable spreads —data contract, rendering and preflight— and continuation adjustments anchored to content. The library gains validated SVGs and the desk, editable facing pages.
- The visual editor, from draft to production in a single day
From library research to production deployment: a specification with twelve tickets, an immersive layout desk, per-Edition local composition, Article correction with protected re-extraction, and — closing the night — editorial formatting inside the text.
- A real drop cap and a template editor: the longest day of the project
Eight hours of work in a row: we fix the floating drop cap down to the millimetre, close issue #7 and the template tickets, and end up with a complete template editor; the panel gains sections and the pilot lets you pick the AI model per piece.
- Review on two axes: five real findings and dead code out
A review with two parallel reviewers, repo standards and spec, of all the November 3rd work. Five real findings, including a WordPress detail no test could catch; I also removed columns nobody read and closed the open issues with evidence.
- Adaptive pages: from spec to production in one day
A 14-round grilling session, seven tracer bullets deployed, and calibration with actual n2 content: the engine now selects the layout for each article and corrects itself when it does not fit.
- The "Update" button now actually updates, and the connector updates itself
We closed the loop on dashboard updates: inventory refreshes are now real, core updates work again with WordPress 7.1, and the dashboard pushes connector updates to sites without needing to enter any wp-admin.
- Templates in the database: Auto Magazine’s first post-MVP improvement
First day of post-MVP improvements: PDF templates move from the filesystem to the database, and the dashboard gains complete CRUD support, verified in production.
- Fullscreen, a Shadow at the Fold, Viewer and Docs in Production
The magazine viewer is now in production with fullscreen mode and a shadow at the fold; in the evening, the whole application got commented and the documentation with its reading site went to production too.